Project Description
A close relationship with the Governors, Head Teacher, Heads of Departments, educationalists and students developed throughout the design and construction of the new Manor CE School, resulting in a remarkable purpose built state of the art educational facility.
The facility benefits from the following sustainable technologies:
- Solar water pre-heating
- Ground source heating
- High efficiency l0-nox boilers
- Mixed mode natural ventilation
- High performance envelope materials and solar controlled glazing
- Surface water balancing attenuation lagoon