Manor CE School

Project Description

A close relationship with the Governors, Head Teacher, Heads of Departments, educationalists and students developed throughout the design and construction of the new Manor CE School, resulting in a remarkable purpose built state of the art educational facility.

The facility benefits from the following sustainable technologies:

  • Solar water pre-heating
  • Ground source heating
  • High efficiency l0-nox boilers
  • Mixed mode natural ventilation
  • High performance envelope materials and solar controlled glazing
  • Surface water balancing attenuation lagoon

Project Details

Categories: